Quantcast
Channel: Spokesman Review Classifieds: Legal Notices
Viewing all articles
Browse latest Browse all 11597

CALL FOR BIDS ADDISON ST. F...

$
0
0
CALL FOR BIDS Addison St. from Columbia Ave. to 525' North of Dalke Ave. / Calispel St. from Wellesley Ave. to Queen Ave. Engineering Services File No. 2013207 NOTE: THIS PROJECT HAS A TWO WEEK BID PERIOD This project consists of the construction of approximately 855 cubic yards of excavation and embankment, 2100 square yards of pavement repair excavation, 215 linear feet of storm sewer, 6 drainage structures, 2300 square yards of taper planing bituminous pavement, 7100 square yards of 2-inch thick HMA Cl. ½ In. PG 64-28 pavement, 4400 square yards of 3-inch thick HMA Cl. ½ In. PG 64-28 pavement, 1271 linear feet of 6 inch water line, sundry utility adjustments, and other related miscellaneous items. The City of Spokane Purchasing Department, Fourth floor, City Hall, 808 West Spokane Falls Boulevard, Spokane WA 99201-3316, will receive sealed bids until 1:00 p.m., July 14, 2014 for the above project located in Spokane, Washington, in accordance with the Contract Documents on file in the office of the Director, Engineering Services Department. The bids will be publicly opened and read at 1:15 p.m. in the City Council Chambers. Copies of the Contract Documents are available at www.cityofspokaneplans.com . The Planholders list is also available at this website. Additional project information including the Engineer's estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following the appropriate links at the following website: www.spokaneengineering.org/ bid-information. The City of Spokane, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulation, Department of Transportation, subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enter-prises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin, or sex in consideration for an award. Bids shall be submitted on the forms provided in accordance with the provisions of the Specifications. Irregular bid proposals will be rejected in accordance with the specifications. Cash, cashier's check, a certified check or surety bond in the sum of five percent (5%) of the Total Project Bid must accompany the copy of the bid filed with the City Clerk. Successful bidder shall execute the Contract within TEN (10) calendar days after receiving the Contract. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated herein, the bid proposal deposit shall be forfeited to the City of Spokane. The City of Spokane will normally award this Contract or reject bids within FORTY FIVE (45) calendar days after the time set for the bid opening. If the lowest responsible Bidder and the City of Spokane agree, this deadline may be extended. If they cannot agree on an extension by the 45-calendar day deadline, the City of Spokane reserves the right to Award the Contract to the next lowest responsible Bidder or reject all Bids. The City has a new policy regarding addenda. Refer to the Notice to Prospective Bidders Regarding Bid Phase Questions. In accordance with SMC 7.06.500 and RCW 39.04.350(1), the low bidder shall complete the Supplemental Bidder Responsibility Criteria form located in Appendix C. Failure to promptly submit the form including supporting documen-tation if required may delay award of the Contract. Note regarding new specifica-tions: The City of Spokane is using WSDOT's 2014 Standard Specifications. Bidders should allow sufficient time to familiarize themselves with the WSDOT 2014 specifications prior to bidding the project. SR28013

Viewing all articles
Browse latest Browse all 11597

Trending Articles