Quantcast
Channel: Spokesman Review Classifieds: Legal Notices
Viewing all articles
Browse latest Browse all 11597

WENATCHEE SCHOOL DISTRIC T N...

$
0
0
Wenatchee School Distric t No. 246 Lincoln Elementary School Modernization and Addition project GC/CM Services Request for Qualifications Response Date: August 15, 2014, 1 PM (PDT). The Wenatchee School District No. 246 is requesting written state- ments of qualifications (SOQ) from firms interested in providing General Contractor/ Construction Manager (GC/CM) services for the construction of the Lincoln Elementary School Modernization and Addition. Project located at 1224 Methow St. Wenatchee, WA. 98801. The alternate public works contracting procedure authorized in RCW 39.10 will be utilized for this procurement. The Lincoln Elementary School project has a Maximum Allowable Construction Cost (MACC) of $14,734,900 dollars. The project includes a sub- stantial remodel and modern- ization, all portions of the current building will be affected with new construction. The original 34,812 sf building was built in the late 1950’s. Then in 1987, the building was over-framed, a tile roof installed, and a 15,200 sf addition was built to contain the district’s special education program. Components of the program include architectural upgrades to optimize the facility, enhanced security, upgraded systems (data, electrical, access, security, communication, etc.), and removal of concrete tile roof and installation of new lightweight roofing system, parking lot and site access improvements, and site safety improvements. The work will be phased to provide for construction during an ongoing school program of activities. Schematic design is scheduled to be complete by September 19, 2014. Construction is anticipated to be accomplished from May 1, 2015 to June 1, 2016. The project will follow the Washington State Sustainable Schools Protocol (WSSP) and reporting require- ments. The GC/CM will participate in providing design, construction and administrative support to include the District’s WSSP submittal to OPSI. The Architect for the project is Forte Architects, of Wenatchee. The principal-in-charge is Tom Bassett, AIA. Firms interested in submitting a response to the (RFQ), for this project, should request a copy from Bill Grubich (Hill Inter- national), via email or written correspondence at the address noted below: Mr. Bill Grubich Principal in Charge Wenatchee School District #246 c/o Hill International, Inc. 818 W. Riverside Ave,Ste 350 Spokane, WA 99201 509-747-8031 (phone) Email: williambgrubich@hillintl.com Eight (8), sealed envelope/box, copies of the response to the SOQ need to be received by August 15, 2014 at 1 pm (PTD) at the hill office noted above. Delivery of the response, by the date and time stated herein, is the responsibility of the respon- dent. SOQ’s received late will not be accepted. Dates of publication: July 25, 2014 and August 1, 2014 SR28124

Viewing all articles
Browse latest Browse all 11597

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>